This report represents electricity path from generation source both the guidance back to the role point. In our case consumption point is 20A Over-counter Kitchen Receptacle, located at: Richmond Hill, Ontario. According to the local anesthetic distribution company Power Stream the bulk of billet consumed in Richmond Hill and Markham is generated at Pickering/Darlington Generation Stations. From GS electricity goes through step-up transformer cumulation to High Voltage transmission lines in order to be transferred longer distance; in some cases that could be up to 500,000V transmission lines. The primary consumers of generated electricity are Industrial Facilities; they require higher voltage stimulant and as the meter of fact first use generated electricity. dump the stream, electricity goes through step down transformer, transmission sub-stations and sub-transmission lines; promptly voltage is reduced to 34,500 Volts. Through Distribution Sub-stations and Step down Transformers (13,800V) electricity reaches local grid and secondary consumers: commercial and residential sector.
Before enter our house electricity must be reduced to proper voltage: 120/208V; for that achievement utilize local step-down transformer located across the street from the residence. From the transformer author line connected to the power meter, and then goes to the Electrical gore (120/208V, 200A Cutler dope). First connection to the main disconnect breaker: 2P, 100A Cutler Hummer breaker, then electricity branches off to electrical circuits. Our selected over-counter kitchen receptacle connected to: 1P, 20A, 50/60Hz Cutler Hummer breaker (BR120).
Therefore, we continued the path all the way from generation point to consumption point.If you want to get a full essay, order it on our website:
OrderessayIf you want to get a full essay, wisit our page:
write my essay .
No comments:
Post a Comment